Service & Panel Upgrades

Upgrade to a 200A or 320A service — built for EVs, pools, and chef's kitchens.

Your panel is the heart of the home. Aging Federal Pacific, Zinsco, or undersized 100A services can't safely support induction ranges, EV chargers, heat pumps, and pool equipment. We upgrade your service end-to-end — meter, mast, panel, grounding, and permit.

When You Need This

200A and 320A panel upgrades engineered for the modern luxury home.

  • Your panel is Federal Pacific Stab-Lok, Zinsco, or Pushmatic
  • You're installing an EV charger, pool, or whole-home generator
  • You're remodeling a kitchen with induction or steam appliances
  • Insurance is requiring a panel replacement before renewal
  • Your service is 100A or 150A and breakers are full
  • You see rust, scorching, or double-tapped breakers in the panel
What's Included

Every panel upgrades project, fully scoped.

Service Upgrade Package

  • Oncor coordination, disconnect, and reconnect
  • New meter base and weather-tight mast
  • 200A or 320A/400A main breaker panel
  • Code-compliant grounding electrode system
  • Whole-home surge protective device (Type 2 SPD)
  • Tamper-resistant load center with labeled directory

Inside the Panel

  • All circuits transferred and re-terminated to torque spec
  • AFCI / GFCI protection brought up to current NEC
  • Neutrals and grounds properly separated
  • Bonding jumpers verified at water and gas
  • Subpanels rebalanced for even phase loading
Our Process

A clear path from first call to final inspection.

01

Load calculation & site visit

We perform a written NEC load calc based on your appliances, EV plans, and HVAC — so the new service is sized for the next 25 years.

02

Permit & Oncor coordination

We file the city permit, schedule the Oncor disconnect, and align with the city inspector.

03

Single-day install

Most service upgrades are completed in one day with a planned 4–6 hour power outage you'll know about in advance.

04

Inspection & re-energize

City inspection same day or next morning. Oncor reconnects and we verify every circuit before we leave.

Transparent Pricing

Flat-rate, written, approved before we start.

100A → 200A service upgrade
Includes meter, mast, panel, permit
from $3,850
200A → 320A/400A service upgrade
from $6,950
Federal Pacific / Zinsco swap
from $3,450
Subpanel addition (60A–125A)
from $1,650

Final pricing depends on meter location, mast condition, and grounding access. We provide a flat, written quote after the on-site load calc.

Frequently Asked

Answers from our master electricians.

Request your panel upgrades estimate.